Re: Data Center Facility - OCP Project Call

Madhusudan Iyengar <miyengar@...>
 

October 20 2021

    • Sustainability Track (25 minutes)

      • Dharmesh Jain (FB), Jordan Tse (FB), Fahmida Bangert (IT Renew), 

    • Modular DC Guidelines (15 minutes)

      • Rob Coyle to lead discussion

      • *** Team needs help ***

      • document construction, review, recommendations

    • Round Table (20 min)

      • OCP Summit discussion

        • In person attendance

        • Session moderation (time checks, Q&A management, notes for follow up)

      • White Paper discussion

        • Unique to OCP work vs Common to industry (OCP publishing a position)

        • Workstream vs 1 off White Paper

        • Formalizing a Review Process

        • Rubric for White Paper review (Suggestion)

          • Relevance of topic

          • Completeness and quality of content

          • Reference of work to others

          • Articulation of spec, guidelines, position

        • Select reviewers

          • DCF 2 (suggestion)

          • OCP (but not DCF) 2 (suggestion)

          • External to OCP 2 (suggestion)

          • Get commitment from reviewers

          • Document formal review in writing

        • Ask White Paper Team to formally address reviewer comments in writing and through changes to the White Paper

          • Review feedback does not need to be binding


Facebook Presentation - Hardware Utilization Efficiency (HUE) Metric

mark.dansie@...
 

Hi DCF Community,

 

Just in case you missed it there was a really interesting presentation made by Facebook during the recent Sustainability Initiative Metrics call, to socialise their work to create a new metric called Hardware Utilization Efficiency (HUE).

 

The recording of the presentation can be accessed here https://youtu.be/JBnQ5KfzPEU  starting at 6:56 minutes in.

 

Both Anthony Chan https://www.linkedin.com/in/anthony-chan-38456a46 and Jayati Athavale https://www.linkedin.com/in/jayati-athavale-48ab3755  fb who presented this, are interested in getting your feedback.

 

They will also be giving a presentation about HUE during the OCP Summit on November 10, 1:10pm – 1:20pm.

 

 

Kind regards,

 

 

Mark Dansie

OCP ReadyTM Lead

Open Compute Project (OCP)  

Mobile/Signal/WhatsApp/Telegram: +447986 502 896

 


Webinar - Overview of DMTF's Redfish 2021.2 release

John Leung
 

DMTF has released its Redfish 2021.2 update, and is hosting a free one-hour review of its contents (Zoom webinar, on October 6th at 8:00 a.m. PT)


The Forum chairs will present the contents of the release. The new release includes the:

  • OAuth 2.0 Authorization Framework allowing for authorization to be performed by an external entity – no usernames or passwords need to be provided by the client.
  • Model extensions to support SmartNICs use cases including as a firewall, offload processors dedicated to the networking function, or as a SoC
  • Key provisioning via Redfish added to support NVMe-oF boot use cases where UEFI and the OS need key information to connect to remote NVMe-oF targets.


These latest enhancements were driven by the growth of Redfish and interoperability feedback received from implementers. A more details on 2021.2, see https://www.dmtf.org/content/redfish-release-20212-now-available


Following the webinar portion, logistics will be provided to join a Q&A session and discussion immediately following. For questions regarding the webinar, email: webinars@.... To register - Register


John Leung

OCP IC Representative to the Hardware Management project


Comment Period Closed: Nautilus Data Technologies - Stockton 1

mark.dansie@...
 

Data Center Facility Project

Facility Recognition Program

 

Comment period is now CLOSED. Information below will remain available for the community to view.

Thank you.

--

Mark Dansie

OCP ReadyTM Co-Lead

 


Re: plans for security

Joey Arato
 

TY for the feedback it super helpful. I’m going to flag this for a follow up in mid Oct my Cal is horrible right now but would love to reconnect. Think if we could setup an update for you all as well to the DCF OTS project that would be fantastic. Ill reach out in a few weeks and we can see what we can setup. As always thank you!

 

Joey

 

signature_275395946

 

Joey Arato

DC Information Security Engineer | DC InfoSec

4500 Like Way, Fort Worth, TX 76177

Facebook | Mobile (650) 709-8029

 

 

From: OCP-DCF@OCP-All.groups.io <OCP-DCF@OCP-All.groups.io> on behalf of Elaine R Palmer <erpalmer@...>
Date: Monday, September 20, 2021 at 3:20 PM
To: OCP-DCF@OCP-All.groups.io <OCP-DCF@OCP-All.groups.io>
Subject: Re: [OCP-DCF] plans for security

Thanks Joey, 

 

In the OCP Security project, mandatory requirements have been met with pushback, particularly when long lead times (~3 years) are involved to develop and certify hardware.   There are multiple competing positions: 

  1. Mandatory requirements improve the overall industry, but discourage some vendors from participating at all.
  2. Public information-gathering checklists (as we have now) are helpful to purchasers, but may expose suppliers' shortcomings and / or  confidential product plans.
  3. Information-gathering checklists are very helpful guides for purchasers, but they need not be public.  Purchasers are on their own to collect the information from suppliers, e.g., under a non-disclosure agreement.

As you might guess, with three options, and even more opinions, it's hard to reach consensus. 

 

Please keep us (the Security Project) posted!  Let us know if you want to give an update in one of our Tuesday calls, 11:30am ET.
 

_____________________________________
Elaine R. Palmer, Senior Technical Staff Member
Secure Systems and Academy of Technology
IBM T.J. Watson Research Center

 

 

 


Re: plans for security

Elaine R Palmer
 

Thanks Joey, 
 
In the OCP Security project, mandatory requirements have been met with pushback, particularly when long lead times (~3 years) are involved to develop and certify hardware.   There are multiple competing positions: 
  1. Mandatory requirements improve the overall industry, but discourage some vendors from participating at all.
  2. Public information-gathering checklists (as we have now) are helpful to purchasers, but may expose suppliers' shortcomings and / or  confidential product plans.
  3. Information-gathering checklists are very helpful guides for purchasers, but they need not be public.  Purchasers are on their own to collect the information from suppliers, e.g., under a non-disclosure agreement.
As you might guess, with three options, and even more opinions, it's hard to reach consensus. 
 
Please keep us (the Security Project) posted!  Let us know if you want to give an update in one of our Tuesday calls, 11:30am ET.
 
_____________________________________
Elaine R. Palmer, Senior Technical Staff Member
Secure Systems and Academy of Technology
IBM T.J. Watson Research Center
 
 



Re: plans for security

Joey Arato
 

Hi Elaine

 

Have a mix of a few answers. We have two workstreams that will both be information in nature and a 3rd that will we are exploring what applying having it as part of the OCP Ready Spec will look like. This workstream is specifically around logging and monitoring for these networks. In addition to the OCP ready spec we are in the early stages of partnering with other groups such ISA, OPC-UA & Redfish to better define and drive adoption of the specifications.

 

Joey

 

signature_1510492145

 

Joey Arato

DC Information Security Engineer | DC InfoSec

4500 Like Way, Fort Worth, TX 76177

Facebook | Mobile (650) 709-8029

 

 

From: OCP-DCF@OCP-All.groups.io <OCP-DCF@OCP-All.groups.io> on behalf of Elaine R Palmer <erpalmer@...>
Date: Monday, September 20, 2021 at 10:31 AM
To: OCP-DCF@OCP-All.groups.io <OCP-DCF@OCP-All.groups.io>
Subject: Re: [OCP-DCF] plans for security

Hello DCF folks, 

 

As your sub-projects in security progress, will your ultimate goal be compliance or informational?  For example, when your security work is done, published, and approved by the Incubation Committee, will OCP-Ready data centers have to comply with new requirements around security?  Or, will the result of your work be a white paper advising data centers on best practices?  Or, something else.  .  .?

 

Thanks.

Elaine

 

_____________________________________
Elaine R. Palmer, Senior Technical Staff Member
Secure Systems and Academy of Technology
IBM T.J. Watson Research Center

 


Re: plans for security

Elaine R Palmer
 

Hello DCF folks, 
 
As your sub-projects in security progress, will your ultimate goal be compliance or informational?  For example, when your security work is done, published, and approved by the Incubation Committee, will OCP-Ready data centers have to comply with new requirements around security?  Or, will the result of your work be a white paper advising data centers on best practices?  Or, something else.  .  .?
 
Thanks.
Elaine
 
_____________________________________
Elaine R. Palmer, Senior Technical Staff Member
Secure Systems and Academy of Technology
IBM T.J. Watson Research Center



Invitation to Comment: - Nautilus Data Technologies - Stockton 1

mark.dansie@...
 

Data Center Facility Project

Facility Recognition Program

The Data Center Facility Project community members are provided the opportunity to review and comment on Site Assessments submitted by Colo Solution Providers for entrance into the OCP Ready Facility Recognition Program. The link below allows for Comment with inquiries or questions regarding the details and results of the Site Assessment.

·      Colo SP: Nautilus Data Technologies

·      Location: Stockton 1

·      Link: Site Assessment

·      Link: Presentation

Comment period is open for 1 week and will close on Monday 27th September, 2021.

 

Thank you.

--

Mark Dansie

OCP ReadyTM Co-Lead

 


Agenda: Data Center Facility - OCP Project Call, Sep 15

Madhusudan Iyengar <miyengar@...>
 

Hi All,

Agenda for today's call.
  • OCP Ready: Nautilus Group (20 min)
  • Track Updates (15 min)
  • OCP Summit discussion (10 min)
  • Discussion - White paper categorization (10 min)
  • Round Table (5 min)
Thanks.

Madhu and Bret


Re: Introduction: Dejan Gakovic (UL)

Joey Arato
 

Hi Dejan good to meet you. I’d love to setup some time to talk about what we are doing with the DCT OT Security project and see if there interest from your side. Feel free to ping me directly jva@... and we can setup some time if there interest on your side. Have a great week.

 

signature_1379465934

 

Joey Arato

DC Information Security Engineer | DC InfoSec

4500 Like Way, Fort Worth, TX 76177

Facebook | Mobile (650) 709-8029

 

 

From: OCP-DCF@OCP-All.groups.io <OCP-DCF@OCP-All.groups.io> on behalf of Dejan Gakovic via groups.io <Dejan.Gakovic@...>
Date: Wednesday, September 1, 2021 at 10:38 AM
To: OCP-DCF@OCP-All.groups.io <OCP-DCF@OCP-All.groups.io>
Subject: [OCP-DCF] Introduction: Dejan Gakovic (UL)

To Whom It May Concern:

 

As you may be aware, UL (Underwriters Laboratories) recently joined the OCP as a Platinum member and I wanted to introduce myself to this group.

 

My name is Dejan Gaković, I have been with UL for 17 years and currently serve as UL’s Manager for Data Centers & Enterprise Systems. 

During my career at UL, I served in various roles, from Staff Engineer, Engineering Leader to Business Development.   Prior to UL, I was a Network Engineer at Nortel Networks where I planned and managed Central Office hardware installations all over the U.S.A.

 

My personal expertise is in:

UL/IEC/EN62368-1 Audio/Video, Information and Communication Technology Equipment - Part 1: Safety Requirements;

UL/IEC/EN 62133-1/2 Secondary Cells and Batteries Containing Alkaline or Other Non-Acid Electrolytes

UL 2416 Audio/Video, Information and Communication Technology Equipment Cabinet, Enclosure and Rack Systems

UL 2755 Outline of Investigation for Modular Data Centers

 

Let me know if you have any questions regarding UL or our participation in the OCP. 

We are here to listen, answer questions and to help you and your organizations.   

 

 

Regards,

Dejan Gaković

Industry Manager

Data Centers & Enterprise Systems 

------------------------------------------------------------------------------------
UL LLC.
333 Pfingsten Rd.
Northbrook, IL 60062-2096 USA
T:  847.664.3598

M: 847.217.6959

 

 


This e-mail may contain privileged or confidential information. If you are not the intended recipient: (1) you may not disclose, use, distribute, copy or rely upon this message or attachment(s); and (2) please notify the sender by reply e-mail, and then delete this message and its attachment(s). Underwriters Laboratories Inc. and its affiliates disclaim all liability for any errors, omissions, corruption or virus in this message or any attachments.


Introduction: Dejan Gakovic (UL)

Dejan Gakovic
 

To Whom It May Concern:

 

As you may be aware, UL (Underwriters Laboratories) recently joined the OCP as a Platinum member and I wanted to introduce myself to this group.

 

My name is Dejan Gaković, I have been with UL for 17 years and currently serve as UL’s Manager for Data Centers & Enterprise Systems. 

During my career at UL, I served in various roles, from Staff Engineer, Engineering Leader to Business Development.   Prior to UL, I was a Network Engineer at Nortel Networks where I planned and managed Central Office hardware installations all over the U.S.A.

 

My personal expertise is in:

UL/IEC/EN62368-1 Audio/Video, Information and Communication Technology Equipment - Part 1: Safety Requirements;

UL/IEC/EN 62133-1/2 Secondary Cells and Batteries Containing Alkaline or Other Non-Acid Electrolytes

UL 2416 Audio/Video, Information and Communication Technology Equipment Cabinet, Enclosure and Rack Systems

UL 2755 Outline of Investigation for Modular Data Centers

 

Let me know if you have any questions regarding UL or our participation in the OCP. 

We are here to listen, answer questions and to help you and your organizations.   

 

 

Regards,

Dejan Gaković

Industry Manager

Data Centers & Enterprise Systems 

------------------------------------------------------------------------------------
UL LLC.
333 Pfingsten Rd.
Northbrook, IL 60062-2096 USA
T:  847.664.3598

M: 847.217.6959

 

 


This e-mail may contain privileged or confidential information. If you are not the intended recipient: (1) you may not disclose, use, distribute, copy or rely upon this message or attachment(s); and (2) please notify the sender by reply e-mail, and then delete this message and its attachment(s). Underwriters Laboratories Inc. and its affiliates disclaim all liability for any errors, omissions, corruption or virus in this message or any attachments.


Re: OCP Ready Colo Site Assessment Revision 2020A v2.5

Bret Lehman
 

Great milestone – thanks, Mark!

 

Bret Lehman, PE

Director of Product and Business Development

33 Pony Farm Road

Clayton, NC 27520

Mobile: 919-437-1752   

www.pcxcorp.com

 

From: OCP-DCF@OCP-All.groups.io <OCP-DCF@OCP-All.groups.io> On Behalf Of mark.dansie@...
Sent: Wednesday, September 1, 2021 7:47 AM
To: OCP-DCF@OCP-All.groups.io
Subject: [OCP-DCF] OCP Ready Colo Site Assessment Revision 2020A v2.5

 

Hi DCF Community,

 

Just to let you know the revised colo site assessment that will allow data centers that host Open Racks fitted with RDHx in an IT technical space without cold or hot aisle air containment, to meet the OCP Ready Requirements, is now available for download via the links below:

 

Link: DCF/ OCP Ready Wiki

 

Link: OCP Ready™ Facility Recognition Program

 

 

Kind regards,

 

 

Mark Dansie

OCP ReadyTM Lead

Open Compute Project (OCP)  

Mobile/Signal/WhatsApp/Telegram: +447986 502 896

 

 


OCP Ready Colo Site Assessment Revision 2020A v2.5

mark.dansie@...
 

Hi DCF Community,

 

Just to let you know the revised colo site assessment that will allow data centers that host Open Racks fitted with RDHx in an IT technical space without cold or hot aisle air containment, to meet the OCP Ready Requirements, is now available for download via the links below:

 

Link: DCF/ OCP Ready Wiki

 

Link: OCP Ready™ Facility Recognition Program

 

 

Kind regards,

 

 

Mark Dansie

OCP ReadyTM Lead

Open Compute Project (OCP)  

Mobile/Signal/WhatsApp/Telegram: +447986 502 896

 

 


REMINDER: OCP DCF PROJECT CALL TOMORROW

Bret Lehman
 

Looking forward to talking with everyone who is able to join the call tomorrow – agenda as follows:

 

Open Compute Project (OCP) - Data Center Facilities (DCF) LINK

 

August  18 2021

  • Recap of July meeting                                                                                    (5 minutes)
  • Track updates and track feedback on Objectives/Planning methodology   (30 minutes)
    • OCP Ready (Mark Dansie, Rob Coyle)
    • Advanced Cooling Facilities (Don Mitchell)
    • Modular DC (Bob Oliver)
    • OTS (Joey Arato)
  • OCP Summit: List of OCP Abstracts in DCF Space                                     (5 minutes)
    • Eight abstracts accepted (only one rejected)
    • All granted equal 25-minute presentation times during DCF session
    • DCF session is 1-5pm on Wednesday, November 10
  • Redfish for Infrastructure Systems: Jeff/John, OCP Redfish Forum              (15 minutes)
  • Open discussion                                                                                             (5 minutes)

 

 

Bret Lehman, PE

Director of Product and Business Development

33 Pony Farm Road

Clayton, NC 27520

Mobile: 919-437-1752   

www.pcxcorp.com

 


OCP China Day 2021 Presentation - Open Rack V3 New generation of Rack and Power

mark.dansie@...
 

Hi DCF Community,

 

There was a presentation given by Steve Mills and Hamid Keyhani of Facebook at the recent OCP China Day 2021, which contains some useful information about the Open Rack V3 development.

 

Video Link:  Open Rack V3 - New generation of Rack and Power

 

Presentation Deck Link: Open Rack V3 - New generation of Rack and Power

 

Current timelines mentioned in the presentation for OR V3 are:

 

  • All specifications for the entire project released for approval by OCP in early 2022

 

  • Components available for production in late 2022 or early 2023

 

 

 

Kind regards,

 

 

Mark Dansie

OCP ReadyTM Lead

Open Compute Project (OCP)  

Mobile/Signal/WhatsApp/Telegram: +447986 502 896

 

 


Re: Reviewing support for "Immersion Requirements rev2"

Rolf Brink <Rolf.Brink@...>
 

--- Please do NOT reply to the mailing list. Instead, address any questions or comments by email to me directly ---

 

Dear members of the OCP ACS and DCF groups,

 

I wish to remind you of the request below regarding “Immersion Requirements revision 2”. The focus group would appreciate your help in the form of content review. You can add your input in the form of comments in the main document or suggest additions in the “Suggested Changes” document.

 

Review document link: https://docs.google.com/document/d/1VN0yd5bySgiIxwWTpWUcOejionp6cz5D/edit#heading=h.haapch

Suggested changes document link: https://drive.google.com/open?id=1vXaiFskJUy1zsOZZ8OsPFXnQw4xF08ZLYOlRiftcpc0

 

Based on your feedback we are now discussing and adding dielectric fluid quality items to the requirements. Starting August 18, we intend to process all community input, so any comments or additions you may have, will be very welcome.

 

Kind regards,

 

Rolf Brink

Asperitas

Immersed Computing®

 

T: +31 88 96 000 00 | M: +31 6 50 246 338 | E: Rolf.Brink@... | W: www.Asperitas.com

 

From: ocp-acf@OCP-All.groups.io <ocp-acf@OCP-All.groups.io> On Behalf Of Rolf Brink via groups.io
Sent: Thursday, 22 July 2021 23:36
To: OCP-ACS@OCP-All.groups.io; 'OCP-ACS-Immersion-Cooling@OCP-All. groups. io' <OCP-ACS-Immersion-Cooling@OCP-All.groups.io>; ocp-acf@OCP-All.groups.io; OCP-DCF@OCP-All.groups.io
Subject: [ocp-acf] Reviewing support for "Immersion Requirements rev2"

 

Dear members of the OCP ACS and DCF groups,

 

I would like to let you know that the new Immersion Requirements Rev2 document has been prepared for broader community review. Since these requirements also relate to facilities and operators, I wish to request review support of both our communities.

 

Document link:

https://docs.google.com/document/d/1VN0yd5bySgiIxwWTpWUcOejionp6cz5D/edit#heading=h.haapch

 

Review scope:

We welcome your support by reviewing the overall content, scope and quality of information.

Please do NOT comment on formatting, grammar or spelling. This will be too difficult to keep track of at this stage.

Please exclude the appendices, as these will be built and completed in the following stages of the document.

 

Special request to ACF group:

I kindly request your attention to chapter 6, “Datacenter Interface Requirements”, as this requires harmonisation with on-going activities.

 

On-going work

The document is still work in progress, so keep in mind that the following is still on-going:

  • Specific content related to fluid references is still being discussed and may be subject to change;
  • All requirements still need to be rewritten and more specifically categorised;
  • Intro and appendices will be finalised at the near-completion stage.

 

Feedback:

Please provide your feedback by means of comments in the document.

Please suggest change proposals or content additions in the following document:

“Suggested changes to ACS Immersion documents”: https://drive.google.com/open?id=1vXaiFskJUy1zsOZZ8OsPFXnQw4xF08ZLYOlRiftcpc0

 

Kind regards,

 

Rolf Brink

Asperitas

Immersed Computing®

 

T: +31 88 96 000 00 | M: +31 6 50 246 338 | E: Rolf.Brink@... | W: www.Asperitas.com

 

 

Find, follow and like us at LinkedIn, Facebook, Google+, Youtube and Twitter!

 

This electronic message contains information from Asperitas, which may be privileged or confidential. The information is intended for use only by the individual(s) or entity named above. If you are not the intended recipient, be aware that any disclosure, copying, distribution or use of the contents of this information is strictly prohibited. If you have received this electronic message in error, please notify me by telephone or email (to the number or email address above) immediately.

 

Asperitas | Laarderhoogtweg 18 | 1101 EA Amsterdam | The Netherlands

 


Re: [ocp-acf] Reviewing support for "Immersion Requirements rev2"

Rolf Brink <Rolf.Brink@...>
 

--moving groups to BCC

 

Thank you, I have added it to the online version of the document and we will discuss it in the workgroup.

 

@All, Please feel free to add more suggestions to the on-line version, as it is editable for anyone on the internet.

 

Please find the link as follows:

https://docs.google.com/document/d/1vXaiFskJUy1zsOZZ8OsPFXnQw4xF08ZLYOlRiftcpc0/edit#heading=h.hjd262kbatnv

 

Kind regards,

 

Rolf Brink

Asperitas

Immersed Computing®

 

T: +31 88 96 000 00 | M: +31 6 50 246 338 | E: Rolf.Brink@... | W: www.Asperitas.com

 

From: ocp-acf@OCP-All.groups.io <ocp-acf@OCP-All.groups.io> On Behalf Of CKC KIMJINBAEK via groups.io
Sent: Friday, 30 July 2021 03:42
To: ocp-acf@ocp-all.groups.io
Cc: OCP-ACS@OCP-All.groups.io; OCP-ACS-Immersion-Cooling@OCP-All. groups. io <OCP-ACS-Immersion-Cooling@ocp-all.groups.io>; OCP-DCF@OCP-All.groups.io
Subject: Re: [ocp-acf] Reviewing support for "Immersion Requirements rev2"

 


Dear Rolf Brink, Don Mitchell, Mariek and coolant manufacturers,

Thanks for your kind reply and detailed explanation.

 

So,  I added a new suggestion in the attachment.

 

Have a nice summer vacation and keep safe.

 

BR

 



-------------------------------

Kim,Jin-Baek/Managing director

CEJN Korea Co., Ltd. / 씨이제이엔코리아()

Tel 02-2662-0274~6    FAX 032-232-0637

Room 607, 6th Floor, 20 Magokjungang 1-ro, Gangseo-gu Seoul, Korea / Zip 07807

www.cejn.kr

--



 

2021 7 23 () 오후 3:56, Rolf Brink <rolf.brink@...>님이 작성:

Hi JB Kim,

 

Thank you, that’s a great question. To prevent conversations and marketing through the mailing list, I kindly request that you (and all others) include your questions, suggestions and responses in the “suggested changes” document provided. That way, the whole project group will be involved in providing you with an answer.

 

“Suggested changes to ACS Immersion documents”: https://drive.google.com/open?id=1vXaiFskJUy1zsOZZ8OsPFXnQw4xF08ZLYOlRiftcpc0.

 

You can also address me directly if you have any inquiries which are related to the work at hand and I will be able to refer you to the specific experts who are involved in the relevant subject matter.

 

I hope this helps.

 

Kind regards,

 

Rolf Brink

Asperitas

Immersed Computing®

 

T: +31 88 96 000 00 | M: +31 6 50 246 338 | E: Rolf.Brink@... | W: www.Asperitas.com

 

From: ocp-acf@OCP-All.groups.io <ocp-acf@OCP-All.groups.io> On Behalf Of CKC KIMJINBAEK via groups.io
Sent: Friday, 23 July 2021 05:17
To: ocp-acf@ocp-all.groups.io; don.mitchell@...
Cc: OCP-ACS@OCP-All.groups.io; OCP-ACS-Immersion-Cooling@OCP-All. groups. io <OCP-ACS-Immersion-Cooling@ocp-all.groups.io>; OCP-DCF@OCP-All.groups.io
Subject: Re: [ocp-acf] Reviewing support for "Immersion Requirements rev2"

 

Dear Rolf Brink, Don Mitchell and coolant manufacturers,

 

I want to ask you one question on how to maintain the quality and performance of coolant for a long time. If you already have an answer, I would be very grateful if you could guide me.

In the case of liquid cooling, it is very important to prevent the quality of the coolant from external moisture or contamination. When you talk about the 10-15 year lifespan you are talking about, please give your opinion on how to maintain the quality of coolant.

 

Stay safe and wish all nice summer vacation.

 

Thanks,

JB KIM

 

2021 7 23 () 오전 6:36, Rolf Brink <rolf.brink@...>님이 작성:

Dear members of the OCP ACS and DCF groups,

 

I would like to let you know that the new Immersion Requirements Rev2 document has been prepared for broader community review. Since these requirements also relate to facilities and operators, I wish to request review support of both our communities.

 

Document link:

https://docs.google.com/document/d/1VN0yd5bySgiIxwWTpWUcOejionp6cz5D/edit#heading=h.haapch

 

Review scope:

We welcome your support by reviewing the overall content, scope and quality of information.

Please do NOT comment on formatting, grammar or spelling. This will be too difficult to keep track of at this stage.

Please exclude the appendices, as these will be built and completed in the following stages of the document.

 

Special request to ACF group:

I kindly request your attention to chapter 6, “Datacenter Interface Requirements”, as this requires harmonisation with on-going activities.

 

On-going work

The document is still work in progress, so keep in mind that the following is still on-going:

  • Specific content related to fluid references is still being discussed and may be subject to change;
  • All requirements still need to be rewritten and more specifically categorised;
  • Intro and appendices will be finalised at the near-completion stage.

 

Feedback:

Please provide your feedback by means of comments in the document.

Please suggest change proposals or content additions in the following document:

“Suggested changes to ACS Immersion documents”: https://drive.google.com/open?id=1vXaiFskJUy1zsOZZ8OsPFXnQw4xF08ZLYOlRiftcpc0

 

Kind regards,

 

Rolf Brink

Asperitas

Immersed Computing®

 

T: +31 88 96 000 00 | M: +31 6 50 246 338 | E: Rolf.Brink@... | W: www.Asperitas.com

 

 

Find, follow and like us at LinkedIn, Facebook, Google+, Youtube and Twitter!

 

This electronic message contains information from Asperitas, which may be privileged or confidential. The information is intended for use only by the individual(s) or entity named above. If you are not the intended recipient, be aware that any disclosure, copying, distribution or use of the contents of this information is strictly prohibited. If you have received this electronic message in error, please notify me by telephone or email (to the number or email address above) immediately.

 

Asperitas | Laarderhoogtweg 18 | 1101 EA Amsterdam | The Netherlands

 


 

--

 

-------------------------------

Kim,Jin-Baek/Managing director

CEJN Korea Co., Ltd. / 씨이제이엔코리아()

Tel 02-2662-0274~6    FAX 032-232-0637

Room 607, 6th Floor20 Magokjungang 1-ro, Gangseo-gu Seoul, Korea / Zip 07807

www.cejn.kr


 

--

 

-------------------------------

Kim,Jin-Baek

CEJN Korea Co., Ltd. / 씨이제이엔코리아()

Tel 02-2662-0274~6    FAX 032-232-0637

Room 607, 6th Floor20 Magokjungang 1-ro, Gangseo-gu Seoul, Korea / Zip 07807

www.cejn.kr


Re: [ocp-acf] Reviewing support for "Immersion Requirements rev2"

CKC KIMJINBAEK <cejnkorea@...>
 


Dear Rolf Brink, Don Mitchell, Mariek and coolant manufacturers,

Thanks for your kind reply and detailed explanation.

So,  I added a new suggestion in the attachment.

Have a nice summer vacation and keep safe.

BR



-------------------------------

Kim,Jin-Baek/Managing director

CEJN Korea Co., Ltd. / 씨이제이엔코리아(주)

Tel 02-2662-0274~6    FAX 032-232-0637

Room 607, 6th Floor, 20 Magokjungang 1-ro, Gangseo-gu Seoul, Korea / Zip 07807

www.cejn.kr

--





2021년 7월 23일 (금) 오후 3:56, Rolf Brink <rolf.brink@...>님이 작성:

Hi JB Kim,

 

Thank you, that’s a great question. To prevent conversations and marketing through the mailing list, I kindly request that you (and all others) include your questions, suggestions and responses in the “suggested changes” document provided. That way, the whole project group will be involved in providing you with an answer.

 

“Suggested changes to ACS Immersion documents”: https://drive.google.com/open?id=1vXaiFskJUy1zsOZZ8OsPFXnQw4xF08ZLYOlRiftcpc0.

 

You can also address me directly if you have any inquiries which are related to the work at hand and I will be able to refer you to the specific experts who are involved in the relevant subject matter.

 

I hope this helps.

 

Kind regards,

 

Rolf Brink

Asperitas

Immersed Computing®

 

T: +31 88 96 000 00 | M: +31 6 50 246 338 | E: Rolf.Brink@... | W: www.Asperitas.com

 

From: ocp-acf@OCP-All.groups.io <ocp-acf@OCP-All.groups.io> On Behalf Of CKC KIMJINBAEK via groups.io
Sent: Friday, 23 July 2021 05:17
To: ocp-acf@ocp-all.groups.io; don.mitchell@...
Cc: OCP-ACS@OCP-All.groups.io; OCP-ACS-Immersion-Cooling@OCP-All. groups. io <OCP-ACS-Immersion-Cooling@ocp-all.groups.io>; OCP-DCF@OCP-All.groups.io
Subject: Re: [ocp-acf] Reviewing support for "Immersion Requirements rev2"

 

Dear Rolf Brink, Don Mitchell and coolant manufacturers,

 

I want to ask you one question on how to maintain the quality and performance of coolant for a long time. If you already have an answer, I would be very grateful if you could guide me.

In the case of liquid cooling, it is very important to prevent the quality of the coolant from external moisture or contamination. When you talk about the 10-15 year lifespan you are talking about, please give your opinion on how to maintain the quality of coolant.

 

Stay safe and wish all nice summer vacation.

 

Thanks,

JB KIM

 

2021 7 23 () 오전 6:36, Rolf Brink <rolf.brink@...>님이 작성:

Dear members of the OCP ACS and DCF groups,

 

I would like to let you know that the new Immersion Requirements Rev2 document has been prepared for broader community review. Since these requirements also relate to facilities and operators, I wish to request review support of both our communities.

 

Document link:

https://docs.google.com/document/d/1VN0yd5bySgiIxwWTpWUcOejionp6cz5D/edit#heading=h.haapch

 

Review scope:

We welcome your support by reviewing the overall content, scope and quality of information.

Please do NOT comment on formatting, grammar or spelling. This will be too difficult to keep track of at this stage.

Please exclude the appendices, as these will be built and completed in the following stages of the document.

 

Special request to ACF group:

I kindly request your attention to chapter 6, “Datacenter Interface Requirements”, as this requires harmonisation with on-going activities.

 

On-going work

The document is still work in progress, so keep in mind that the following is still on-going:

  • Specific content related to fluid references is still being discussed and may be subject to change;
  • All requirements still need to be rewritten and more specifically categorised;
  • Intro and appendices will be finalised at the near-completion stage.

 

Feedback:

Please provide your feedback by means of comments in the document.

Please suggest change proposals or content additions in the following document:

“Suggested changes to ACS Immersion documents”: https://drive.google.com/open?id=1vXaiFskJUy1zsOZZ8OsPFXnQw4xF08ZLYOlRiftcpc0

 

Kind regards,

 

Rolf Brink

Asperitas

Immersed Computing®

 

T: +31 88 96 000 00 | M: +31 6 50 246 338 | E: Rolf.Brink@... | W: www.Asperitas.com

 

 

Find, follow and like us at LinkedIn, Facebook, Google+, Youtube and Twitter!

 

This electronic message contains information from Asperitas, which may be privileged or confidential. The information is intended for use only by the individual(s) or entity named above. If you are not the intended recipient, be aware that any disclosure, copying, distribution or use of the contents of this information is strictly prohibited. If you have received this electronic message in error, please notify me by telephone or email (to the number or email address above) immediately.

 

Asperitas | Laarderhoogtweg 18 | 1101 EA Amsterdam | The Netherlands

 


 

--

 

-------------------------------

Kim,Jin-Baek/Managing director

CEJN Korea Co., Ltd. / 씨이제이엔코리아()

Tel 02-2662-0274~6    FAX 032-232-0637

Room 607, 6th Floor20 Magokjungang 1-ro, Gangseo-gu Seoul, Korea / Zip 07807

www.cejn.kr



--


-------------------------------

Kim,Jin-Baek

CEJN Korea Co., Ltd. / 씨이제이엔코리아()

Tel 02-2662-0274~6    FAX 032-232-0637

Room 607, 6th Floor20 Magokjungang 1-ro, Gangseo-gu Seoul, Korea / Zip 07807

www.cejn.kr


Re: [ocp-acf] Reviewing support for "Immersion Requirements rev2"

Rolf Brink <Rolf.Brink@...>
 

Hi JB Kim,

 

Thank you, that’s a great question. To prevent conversations and marketing through the mailing list, I kindly request that you (and all others) include your questions, suggestions and responses in the “suggested changes” document provided. That way, the whole project group will be involved in providing you with an answer.

 

“Suggested changes to ACS Immersion documents”: https://drive.google.com/open?id=1vXaiFskJUy1zsOZZ8OsPFXnQw4xF08ZLYOlRiftcpc0.

 

You can also address me directly if you have any inquiries which are related to the work at hand and I will be able to refer you to the specific experts who are involved in the relevant subject matter.

 

I hope this helps.

 

Kind regards,

 

Rolf Brink

Asperitas

Immersed Computing®

 

T: +31 88 96 000 00 | M: +31 6 50 246 338 | E: Rolf.Brink@... | W: www.Asperitas.com

 

From: ocp-acf@OCP-All.groups.io <ocp-acf@OCP-All.groups.io> On Behalf Of CKC KIMJINBAEK via groups.io
Sent: Friday, 23 July 2021 05:17
To: ocp-acf@ocp-all.groups.io; don.mitchell@...
Cc: OCP-ACS@OCP-All.groups.io; OCP-ACS-Immersion-Cooling@OCP-All. groups. io <OCP-ACS-Immersion-Cooling@ocp-all.groups.io>; OCP-DCF@OCP-All.groups.io
Subject: Re: [ocp-acf] Reviewing support for "Immersion Requirements rev2"

 

Dear Rolf Brink, Don Mitchell and coolant manufacturers,

 

I want to ask you one question on how to maintain the quality and performance of coolant for a long time. If you already have an answer, I would be very grateful if you could guide me.

In the case of liquid cooling, it is very important to prevent the quality of the coolant from external moisture or contamination. When you talk about the 10-15 year lifespan you are talking about, please give your opinion on how to maintain the quality of coolant.

 

Stay safe and wish all nice summer vacation.

 

Thanks,

JB KIM

 

2021 7 23 () 오전 6:36, Rolf Brink <rolf.brink@...>님이 작성:

Dear members of the OCP ACS and DCF groups,

 

I would like to let you know that the new Immersion Requirements Rev2 document has been prepared for broader community review. Since these requirements also relate to facilities and operators, I wish to request review support of both our communities.

 

Document link:

https://docs.google.com/document/d/1VN0yd5bySgiIxwWTpWUcOejionp6cz5D/edit#heading=h.haapch

 

Review scope:

We welcome your support by reviewing the overall content, scope and quality of information.

Please do NOT comment on formatting, grammar or spelling. This will be too difficult to keep track of at this stage.

Please exclude the appendices, as these will be built and completed in the following stages of the document.

 

Special request to ACF group:

I kindly request your attention to chapter 6, “Datacenter Interface Requirements”, as this requires harmonisation with on-going activities.

 

On-going work

The document is still work in progress, so keep in mind that the following is still on-going:

  • Specific content related to fluid references is still being discussed and may be subject to change;
  • All requirements still need to be rewritten and more specifically categorised;
  • Intro and appendices will be finalised at the near-completion stage.

 

Feedback:

Please provide your feedback by means of comments in the document.

Please suggest change proposals or content additions in the following document:

“Suggested changes to ACS Immersion documents”: https://drive.google.com/open?id=1vXaiFskJUy1zsOZZ8OsPFXnQw4xF08ZLYOlRiftcpc0

 

Kind regards,

 

Rolf Brink

Asperitas

Immersed Computing®

 

T: +31 88 96 000 00 | M: +31 6 50 246 338 | E: Rolf.Brink@... | W: www.Asperitas.com

 

 

Find, follow and like us at LinkedIn, Facebook, Google+, Youtube and Twitter!

 

This electronic message contains information from Asperitas, which may be privileged or confidential. The information is intended for use only by the individual(s) or entity named above. If you are not the intended recipient, be aware that any disclosure, copying, distribution or use of the contents of this information is strictly prohibited. If you have received this electronic message in error, please notify me by telephone or email (to the number or email address above) immediately.

 

Asperitas | Laarderhoogtweg 18 | 1101 EA Amsterdam | The Netherlands

 


 

--

 

-------------------------------

Kim,Jin-Baek/Managing director

CEJN Korea Co., Ltd. / 씨이제이엔코리아()

Tel 02-2662-0274~6    FAX 032-232-0637

Room 607, 6th Floor20 Magokjungang 1-ro, Gangseo-gu Seoul, Korea / Zip 07807

www.cejn.kr